Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff

Frank Padberg. Scheduling Software Projects to Minimize the Development Time and Cost with a Given Staff. In 8th Asia-Pacific Software Engineering Conference (APSEC 2001), 4-7 December 2001, Macau, China. pages 187-194, IEEE Computer Society, 2001. [doi]

Abstract

Abstract is missing.