The following publications are possibly variants of this publication:
- Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output moduleDae-Kyu Kim, Hyun-jung Kim, Tae-Eog Lee. ijpr, 55(11):3092-3109, 2017. [doi]
- Shrinking Number of Clusters by Multi-Dimensional ScalingTae-Chang Jee, Hyunjin Lee, Yillbyung Lee. swap 2006: [doi]
- Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule PatternsWoojin Kim, Tae-Sun Yu, Tae-Eog Lee. tsmc, 51(12):7282-7294, 2021. [doi]
- The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster ToolsJun-Ho Lee, Hyun-jung Kim. tase, 20(4):2668-2677, October 2023. [doi]
- Scheduling of a dual-armed cluster tool with two independent robot armsDaniel Tonke, Tae-Eog Lee. case 2012: 200-205 [doi]
- Modeling and implementing a real-time scheduler for dual-armed cluster toolsYong-Ho Shin, Tae-Eog Lee, Ja-Hee Kim, Hwan-Yong Lee. cii, 45(1):13-27, 2001. [doi]