Analysis of the Robustness of Production Scheduling in Aeronautical Manufacturing Using Simulation: A Case Study

R. Pulido, T. Borreguero-Sanchidrián, Álvaro García-Sánchez, Miguel Ortega-Mier. Analysis of the Robustness of Production Scheduling in Aeronautical Manufacturing Using Simulation: A Case Study. In José Ríos, Alain Bernard, Abdelaziz Bouras, Sebti Foufou, editors, Product Lifecycle Management and the Industry of the Future - 14th IFIP WG 5.1 International Conference, PLM 2017, Seville, Spain, July 10-12, 2017, Revised Selected Papers. Volume 517 of IFIP Advances in Information and Communication Technology, pages 174-183, Springer, 2017. [doi]

Authors

R. Pulido

This author has not been identified. Look up 'R. Pulido' in Google

T. Borreguero-Sanchidrián

This author has not been identified. Look up 'T. Borreguero-Sanchidrián' in Google

Álvaro García-Sánchez

This author has not been identified. Look up 'Álvaro García-Sánchez' in Google

Miguel Ortega-Mier

This author has not been identified. Look up 'Miguel Ortega-Mier' in Google