Mohammad Rohaninejad, Behdin Vahedi Nouri, Zdenek Hanzálek, Reza Tavakkoli-Moghaddam. An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints. Int. J. Prod. Res., 62(11):3994-4013, 2024. [doi]
@article{RohaninejadNHT24, title = {An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints}, author = {Mohammad Rohaninejad and Behdin Vahedi Nouri and Zdenek Hanzálek and Reza Tavakkoli-Moghaddam}, year = {2024}, doi = {10.1080/00207543.2023.2253311}, url = {https://doi.org/10.1080/00207543.2023.2253311}, researchr = {https://researchr.org/publication/RohaninejadNHT24}, cites = {0}, citedby = {0}, journal = {Int. J. Prod. Res.}, volume = {62}, number = {11}, pages = {3994-4013}, }