An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints

Mohammad Rohaninejad, Behdin Vahedi Nouri, Zdenek Hanzálek, Reza Tavakkoli-Moghaddam. An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints. Int. J. Prod. Res., 62(11):3994-4013, 2024. [doi]

@article{RohaninejadNHT24,
  title = {An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints},
  author = {Mohammad Rohaninejad and Behdin Vahedi Nouri and Zdenek Hanzálek and Reza Tavakkoli-Moghaddam},
  year = {2024},
  doi = {10.1080/00207543.2023.2253311},
  url = {https://doi.org/10.1080/00207543.2023.2253311},
  researchr = {https://researchr.org/publication/RohaninejadNHT24},
  cites = {0},
  citedby = {0},
  journal = {Int. J. Prod. Res.},
  volume = {62},
  number = {11},
  pages = {3994-4013},
}