An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints

Mohammad Rohaninejad, Behdin Vahedi Nouri, Zdenek Hanzálek, Reza Tavakkoli-Moghaddam. An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints. Int. J. Prod. Res., 62(11):3994-4013, 2024. [doi]

Abstract

Abstract is missing.