Technical Note - Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem

Paul J. Schweitzer, Edward A. Silver. Technical Note - Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem. Operations Research, 31(2):401-405, 1983. [doi]

Abstract

Abstract is missing.