Effective Constructive Heuristic and Metaheuristic for the Distributed Assembly Blocking Flow-shop Scheduling Problem

Zhongshi Shao, Weishi Shao, Dechang Pi. Effective Constructive Heuristic and Metaheuristic for the Distributed Assembly Blocking Flow-shop Scheduling Problem. Appl. Intell., 50(12):4647-4669, 2020. [doi]

Abstract

Abstract is missing.