Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem

Fei Shi, Shikui Zhao, Yue Meng. Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem. Int. J. Prod. Res., 58(9):2604-2625, 2020. [doi]

Abstract

Abstract is missing.