A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs

Ik-Soo Shim, Hyeok-Chol Kim, Hyoung-Ho Doh, Dong-Ho Lee. A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs. Computers & Industrial Engineering, 61(4):920-929, 2011. [doi]

Abstract

Abstract is missing.