A lot-sizing and scheduling model for multi-stage flow lines with zero lead times

Hartmut Stadtler, Florian Sahling. A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. European Journal of Operational Research, 225(3):404-419, 2013. [doi]

Abstract

Abstract is missing.