A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines

Yi Tan, Lars Mönch, John W. Fowler. A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines. J. Scheduling, 21(2):209-226, 2018. [doi]

Abstract

Abstract is missing.