Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation

Matthias Thürer, Nuno O. Fernandes, Mark Stevenson. Production planning and control in multi-stage assembly systems: an assessment of Kanban, MRP, OPT (DBR) and DDMRP by simulation. Int. J. Prod. Res., 60(3):1036-1050, 2022. [doi]

Abstract

Abstract is missing.