Lin Yu Tseng, Shih-Chieh Chen. A hybrid metaheuristic for the resource-constrained project scheduling problem. European Journal of Operational Research, 175(2):707-721, 2006. [doi]
@article{TsengC06, title = {A hybrid metaheuristic for the resource-constrained project scheduling problem}, author = {Lin Yu Tseng and Shih-Chieh Chen}, year = {2006}, doi = {10.1016/j.ejor.2005.06.014}, url = {http://dx.doi.org/10.1016/j.ejor.2005.06.014}, researchr = {https://researchr.org/publication/TsengC06}, cites = {0}, citedby = {0}, journal = {European Journal of Operational Research}, volume = {175}, number = {2}, pages = {707-721}, }