A hybrid metaheuristic for the resource-constrained project scheduling problem

Lin Yu Tseng, Shih-Chieh Chen. A hybrid metaheuristic for the resource-constrained project scheduling problem. European Journal of Operational Research, 175(2):707-721, 2006. [doi]

@article{TsengC06,
  title = {A hybrid metaheuristic for the resource-constrained project scheduling problem},
  author = {Lin Yu Tseng and Shih-Chieh Chen},
  year = {2006},
  doi = {10.1016/j.ejor.2005.06.014},
  url = {http://dx.doi.org/10.1016/j.ejor.2005.06.014},
  researchr = {https://researchr.org/publication/TsengC06},
  cites = {0},
  citedby = {0},
  journal = {European Journal of Operational Research},
  volume = {175},
  number = {2},
  pages = {707-721},
}