A hybrid metaheuristic for the resource-constrained project scheduling problem

Lin Yu Tseng, Shih-Chieh Chen. A hybrid metaheuristic for the resource-constrained project scheduling problem. European Journal of Operational Research, 175(2):707-721, 2006. [doi]

Abstract

Abstract is missing.