A note on two-stage hybrid flowshop scheduling with missing operations

Chao-Tang Tseng, Ching-Jong Liao, Tai-Xiang Liao. A note on two-stage hybrid flowshop scheduling with missing operations. Computers & Industrial Engineering, 54(3):695-704, 2008. [doi]

Abstract

Abstract is missing.