Multiobject optimal scheduling for semiconductor manufacturing line based on satisfactory control

Zhongjie Wang, Qidi Wu. Multiobject optimal scheduling for semiconductor manufacturing line based on satisfactory control. In American Control Conference, ACC 2002, Anchorage, Alaska, USA, May 8-10 2002. pages 1603-1608, IEEE, 2002. [doi]

Abstract

Abstract is missing.