Wenyan Wang, Zhenhao Xu, Xingsheng Gu. A two-stage discrete water wave optimization algorithm for the flowshop lot-streaming scheduling problem with intermingling and variable lot sizes. Knowl.-Based Syst., 238:107874, 2022. [doi]
Abstract is missing.