Resource-constrained multi-stage processing and assembly scheduling with sequential and batch operations

Song Wu, Yang Wang 0030, Yu Du 0003, Wei Yang 0049, Jianguang Feng. Resource-constrained multi-stage processing and assembly scheduling with sequential and batch operations. J. Heuristics, 31(4):38, December 2025. [doi]

Abstract

Abstract is missing.