Minimizing the total completion time in a distributed two stage assembly system with setup times

Fuli Xiong, Keyi Xing, Feng Wang, Hang Lei, LiBin Han. Minimizing the total completion time in a distributed two stage assembly system with setup times. Computers & OR, 47:92-105, 2014. [doi]

Abstract

Abstract is missing.