The following publications are possibly variants of this publication:
- An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling ProblemKong Lu, Li-ting, Keming Wang, Hanbing Zhu, Takano Makoto, Yu Bin. algorithms, 8(1):19-31, 2015. [doi]
- An Improved Shuffled Frog-Leaping Algorithm for Job-Shop Scheduling ProblemMin-Rong Chen, Xia Li, Na Wang, Hai-Bo Xiao. ibica 2011: 203-206 [doi]
- An Effective Shuffled Frog Leaping Algorithm for Solving Hybrid Flow-Shop Scheduling ProblemYe Xu, Ling Wang, Gang Zhou, Shengyao Wang. icic 2012: 560-567 [doi]
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemChen Fang, Ling Wang. cor, 39(5):890-901, 2012. [doi]
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemLing Wang, Chen Fang. isci, 181(20):4804-4822, 2011. [doi]