Optimization-based litho machine scheduling with multiple reticles and setups

Bing Yan, Hsin-Yuan Chen, Peter B. Luh, Simon Wang, Joey Chang. Optimization-based litho machine scheduling with multiple reticles and setups. In IEEE Conference on Automation Science and Engineering, CASE 2011, Trieste, Italy, Aug. 24-27, 2011. pages 114-119, IEEE, 2011. [doi]

Authors

Bing Yan

This author has not been identified. Look up 'Bing Yan' in Google

Hsin-Yuan Chen

This author has not been identified. Look up 'Hsin-Yuan Chen' in Google

Peter B. Luh

This author has not been identified. Look up 'Peter B. Luh' in Google

Simon Wang

This author has not been identified. Look up 'Simon Wang' in Google

Joey Chang

This author has not been identified. Look up 'Joey Chang' in Google