Bing Yan, Hsin-Yuan Chen, Peter B. Luh, Simon Wang, Joey Chang. Optimization-based litho machine scheduling with multiple reticles and setups. In IEEE Conference on Automation Science and Engineering, CASE 2011, Trieste, Italy, Aug. 24-27, 2011. pages 114-119, IEEE, 2011. [doi]
@inproceedings{YanCLWC11, title = {Optimization-based litho machine scheduling with multiple reticles and setups}, author = {Bing Yan and Hsin-Yuan Chen and Peter B. Luh and Simon Wang and Joey Chang}, year = {2011}, doi = {10.1109/CASE.2011.6042516}, url = {http://dx.doi.org/10.1109/CASE.2011.6042516}, researchr = {https://researchr.org/publication/YanCLWC11}, cites = {0}, citedby = {0}, pages = {114-119}, booktitle = {IEEE Conference on Automation Science and Engineering, CASE 2011, Trieste, Italy, Aug. 24-27, 2011}, publisher = {IEEE}, isbn = {978-1-4577-1730-7}, }