Integrated production planning and scheduling for a mixed batch job-shop based on alternant iterative genetic algorithm

Hong-Sen Yan, Xiao-Qin Wan, Fuli Xiong. Integrated production planning and scheduling for a mixed batch job-shop based on alternant iterative genetic algorithm. JORS, 66(8):1250-1258, 2015. [doi]

Abstract

Abstract is missing.