Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage

Jaehwan Yang. Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage. Computers & OR, 58:1-8, 2015. [doi]

Abstract

Abstract is missing.