Switch On/Interruption Control of Cooling Based on Estimated Acceptable Interruption Duration: An Office Case Study in Japan

Toru Yano. Switch On/Interruption Control of Cooling Based on Estimated Acceptable Interruption Duration: An Office Case Study in Japan. In IECON 2018 - 44th Annual Conference of the IEEE Industrial Electronics Society, Washington, DC, USA, October 21-23, 2018. pages 826-831, IEEE, 2018. [doi]

@inproceedings{Yano18-5,
  title = {Switch On/Interruption Control of Cooling Based on Estimated Acceptable Interruption Duration: An Office Case Study in Japan},
  author = {Toru Yano},
  year = {2018},
  doi = {10.1109/IECON.2018.8591659},
  url = {https://doi.org/10.1109/IECON.2018.8591659},
  researchr = {https://researchr.org/publication/Yano18-5},
  cites = {0},
  citedby = {0},
  pages = {826-831},
  booktitle = {IECON 2018 - 44th Annual Conference of the IEEE Industrial Electronics Society, Washington, DC, USA, October 21-23, 2018},
  publisher = {IEEE},
  isbn = {978-1-5090-6684-1},
}