Switch On/Interruption Control of Cooling Based on Estimated Acceptable Interruption Duration: An Office Case Study in Japan

Toru Yano. Switch On/Interruption Control of Cooling Based on Estimated Acceptable Interruption Duration: An Office Case Study in Japan. In IECON 2018 - 44th Annual Conference of the IEEE Industrial Electronics Society, Washington, DC, USA, October 21-23, 2018. pages 826-831, IEEE, 2018. [doi]

Abstract

Abstract is missing.