Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops

Jae-Min Yu, Rong Huang, Dong-Ho Lee. Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops. Int. J. Prod. Res., 55(11):3266-3282, 2017. [doi]

Abstract

Abstract is missing.