The following publications are possibly variants of this publication:
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruptionJinjiang Yuan, Yundong Mu. eor, 182(2):936-944, 2007. [doi]
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruptionQiulan Zhao, Jinjiang Yuan. scheduling, 16(3):253-260, 2013. [doi]
- On-Line Rescheduling to Minimize Makespan under a Limit on the Maximum Sequence DisruptionYundong Mu, Xiao Guo. ssme 2009: 479-482 [doi]
- A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespanYuan Gao, Jinjiang Yuan, Chi To Ng, T. C. E. Cheng. eor, 273(1):74-81, 2019. [doi]
- Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original JobsQiulan Zhao, Jinjiang Yuan. apjor, 34(5):1-12, 2017. [doi]
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release datesWei-Wei Cui, Zhiqiang Lu. cor, 80:11-22, 2017. [doi]
- A PTAS for single-machine scheduling with release dates and job delivery to minimize makespanLingfa Lu, Liqi Zhang. rairo, 53(4):1261-1266, 2019. [doi]