Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy

Simone Zanoni, Anders Segerstedt, Ou Tang, Laura Mazzoldi. Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy. Computers & Industrial Engineering, 62(4):1025-1033, 2012. [doi]

Abstract

Abstract is missing.