A multi-critical-path co-driven evolutionary algorithm addressing the dual-resource flexible job shop scheduling problem with offline operations and job priority constraints

Ziyu Zhang, Dongchen Qiu, Xinyu Li 0001, Liang Gao 0001, Qihao Liu, Yue Teng, Xuxia Zhang, Jun Wu 0012. A multi-critical-path co-driven evolutionary algorithm addressing the dual-resource flexible job shop scheduling problem with offline operations and job priority constraints. Int. J. Prod. Res., 64(11):4310-4340, 2026. [doi]

Abstract

Abstract is missing.