Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan

Guanghui Zhang, Keyi Xing, Feng Cao. Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan. Int. J. Prod. Res., 56(9):3226-3244, 2018. [doi]

Authors

Guanghui Zhang

This author has not been identified. Look up 'Guanghui Zhang' in Google

Keyi Xing

This author has not been identified. Look up 'Keyi Xing' in Google

Feng Cao

This author has not been identified. Look up 'Feng Cao' in Google