Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan

Guanghui Zhang, Keyi Xing, Feng Cao. Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan. Int. J. Prod. Res., 56(9):3226-3244, 2018. [doi]

@article{ZhangXC18-3,
  title = {Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan},
  author = {Guanghui Zhang and Keyi Xing and Feng Cao},
  year = {2018},
  doi = {10.1080/00207543.2017.1401241},
  url = {https://doi.org/10.1080/00207543.2017.1401241},
  researchr = {https://researchr.org/publication/ZhangXC18-3},
  cites = {0},
  citedby = {0},
  journal = {Int. J. Prod. Res.},
  volume = {56},
  number = {9},
  pages = {3226-3244},
}