A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints

Xiaolong Zheng, Ling Wang. A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints. Expert Syst. Appl., 65:28-39, 2016. [doi]

Abstract

Abstract is missing.