Abstract is missing.
- Introduction: For DaddyWedad J. Elmaghraby, Karima N. Radwan. 1-5 [doi]
- Ubiquitous Operations Research in Production SystemsLeon F. McGinnis. 7-28 [doi]
- Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production SystemsAbhijit Upasani, Reha Uzsoy. 29-68 [doi]
- Refined EM Method for Solving Linearly Constrained Global Optimization ProblemsLu Yu, Shu-Cherng Fang. 69-90 [doi]
- The Price of Anarchy for a Network of Queues in Heavy TrafficShaler Stidham. 91-121 [doi]
- A Comparative Study of Procedures for the Multinomial Selection ProblemEric S. Tollefson, David Goldsman, Anton J. Kleywegt, Craig A. Tovey. 123-160 [doi]
- Vulnerability Discussion in Multimodal Freight SystemsSaniye Gizem Aydin, Pakize Simin Pulat. 161-182 [doi]
- Scheduling and Financial Planning in Stochastic Activity NetworksBajis M. Dodin, Abdelghani A. Elimam. 183-201 [doi]
- A Risk Integrated Methodology for Project Planning Under UncertaintyWilly Herroelen. 203-217 [doi]
- Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness CostsM. Berke Pamay, Kerem Bülbül, Gündüz Ulusoy. 219-247 [doi]
- Multimode Resource-Constrained Project Scheduling Problem Including Multiskill Labor (MRCPSP-MS) Model and a Solution MethodMónica A. Santos, Anabela Pereira Tereso. 249-275 [doi]
- Hybrid Flow Shop Scheduling with Availability ConstraintsHamid Allaoui, Abdelhakim Artiba. 277-299 [doi]
- A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job ShopBenjamin J. Lobo, T. J. Thoney, Russell E. King, James R. Wilson. 301-341 [doi]
- Mine Planning Above and Below Ground: Generating a Set of Pareto-Optimal Schedules Considering Risk and ReturnCandace A. Yano, Carson McFadden. 343-356 [doi]
- Multiple-Lot Lot Streaming in a Two-stage Assembly SystemLiming Yao, Subhash C. Sarin. 357-388 [doi]