Journal: Computers & OR

Volume 16, Issue 4

295 -- 304R. K. Arora, R. K. Sachdeva. Distributed simulation of resource constrained project scheduling
305 -- 313Richard A. Murphy. An improved direct descent algorithm for binary knapsack problems
315 -- 324Mahmut Parlar, Yigal Gerchak. Control of a production system with variable yield and random demand
325 -- 332R. P. Hope, J. A. Sharp. The use of two planning decision support systems in combination for the redesign of an MBA information technology programme
333 -- 340Tapan Sen, Parthasarati Dileepan, Jatinder N. D. Gupta. The two-machine flowshop scheduling problem with total tardiness
341 -- 351Jayprakash G. Patankar, Amitava Mitra. A multi-objective model for warranty cost estimation using multiple products
353 -- 362Tom M. Cavalier, James P. Ignizio, Allen L. Soyster. Discriminant analysis via mathematical programming: Certain problems and their causes
363 -- 378Mahesh C. Gupta, C. Judt, Yash P. Gupta, Siddhartha Balakrishnan. Expert scheduling system for a prototype flexible manufacturing cell: a framework
379 -- 391Jay E. Aronson, B. David Chen. A primary/secondary memory implementation of a forward network simplex algorithm for multiperiod network flow problems
393 -- 395Cliff Ragsdale, Antonie Stam. A note on solving quadratic programs using mixed-integer programming