Journal: Computers & OR

Volume 16, Issue 6

497 -- 512Edward A. Wasil, Bruce L. Golden, Li Liu. State-of-the-art in nonlinear optimization software for the microcomputer
513 -- 532Fatemeh Zahedi. Quantitative evaluation of micro versus larger database products
533 -- 540Veena Adlakha, Tigineh Mersha. Two heuristic techniques for service location: An evaluation and comparison
541 -- 556Sang O. Kim, Marc J. Schniederjans. Heuristic framework for the resource constrained multi-project scheduling problem
557 -- 565Marc J. Schniederjans, Radhika Santhanam. A zero-one goal programming approach for the journal selection and cancellation problem
567 -- 582Y. P. Gupta, D. C. W. Chin. Expert systems and their applications in production and operations management
583 -- 588C. R. Bector, Yash P. Gupta, Mahesh Chander Gupta. V-shape property of optimal sequence of jobs about a common due date on a single machine
589 -- 600Wen Lea Pearn. Approximate solutions for the capacitated arc routing problem

Volume 16, Issue 5

397 -- 408Vahid Lotfi. A labeling algorithm to solve the assignment problem
409 -- 417Y.-L. Chen, Y. H. Chin. Scheduling unit-time jobs on processors with different capabilities
419 -- 430Yash P. Gupta, Tor Guimaraes, T. S. Raghunathan. Personal computing problems and some organizational factors: A multivariate analysis
431 -- 440Kyung Y. Jo. A lagrangian algorithm for computing the optimal service rates in Jackson queuing networks
441 -- 449Vernon Rego, Wojciech Szpankowski. The presence of exponentiality in entropy maximized M/GI/1 queues
451 -- 470Jean-Yves Potvin, Guy Lapalme, Jean-Marc Rousseau. Alto: A computer system for the design of vehicle routing algorithms
471 -- 479Thuruthickara C. John. Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty
481 -- 491Stephen A. Floyd, Charles F. Turner III, K. Roscoe Davis. Model-based decision support systems: An effective implementation framework
493 -- 496Norman P. Archer. Electronic spreadsheet structures

Volume 16, Issue 4

295 -- 304R. K. Arora, R. K. Sachdeva. Distributed simulation of resource constrained project scheduling
305 -- 313Richard A. Murphy. An improved direct descent algorithm for binary knapsack problems
315 -- 324Mahmut Parlar, Yigal Gerchak. Control of a production system with variable yield and random demand
325 -- 332R. P. Hope, J. A. Sharp. The use of two planning decision support systems in combination for the redesign of an MBA information technology programme
333 -- 340Tapan Sen, Parthasarati Dileepan, Jatinder N. D. Gupta. The two-machine flowshop scheduling problem with total tardiness
341 -- 351Jayprakash G. Patankar, Amitava Mitra. A multi-objective model for warranty cost estimation using multiple products
353 -- 362Tom M. Cavalier, James P. Ignizio, Allen L. Soyster. Discriminant analysis via mathematical programming: Certain problems and their causes
363 -- 378Mahesh C. Gupta, C. Judt, Yash P. Gupta, Siddhartha Balakrishnan. Expert scheduling system for a prototype flexible manufacturing cell: a framework
379 -- 391Jay E. Aronson, B. David Chen. A primary/secondary memory implementation of a forward network simplex algorithm for multiperiod network flow problems
393 -- 395Cliff Ragsdale, Antonie Stam. A note on solving quadratic programs using mixed-integer programming

Volume 16, Issue 3

189 -- 193Eng Ung Choo, Gin Hor Chan. Eyeballing heuristics for dynamic lot size problems
195 -- 206Wojtek Michalowski, Tomasz Szapiro. A procedure for worst outcomes displacement in multiple criteria decision making
207 -- 216A. Ariav, Yehuda Kahane, Charles S. Tapiero. A pooled computer center as a risk management tool
217 -- 233Andre B. Bondi. An analysis of finite capacity queues with priority scheduling and common or reserved waiting areas
235 -- 245Hasan Pirkul, Yu-Ping Hou. Allocating primary and back-up copies of databases in distributed computer systems: A model and solution procedures
247 -- 256Krishnamurty Muralidhar, Marietta J. Tretter. The evolution of an expert DSS for electric utility load research
257 -- 269Cheng-I. Yang, Jia-Shung Wang, Richard Chia-Tung Lee. A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile
271 -- 293Tep Sastri, Benito Flores, Juan Valdés. Detecting points of change in time series

Volume 16, Issue 2

85 -- 99Wojciech Szpankowski. Some remarks on uniformly bounded markov chains: multimodality analysis
101 -- 111Bart van Arem. Discrete time analysis of a slotted transmission system
113 -- 116Guoliang Xue. On the convergence of one-dimensional simplex search
117 -- 127Behnam Malakooti. Ranking multiple criteria alternatives with half-space, convex, and non-convex dominating cones: quasi-concave and quasi-convex multiple attribute utility functions
129 -- 143Richard M. Burton, Børge Obel. Using historical information in the design of a decentralized firm s budgetary planning system
145 -- 159Jonathan F. Bard, Jeanne L. Miller. Probabilistic shortest path problems with budgetary constraints
161 -- 172P. Simin Pulat. A decomposition algorithm to determine the maximum flow in a generalized network
173 -- 184Irvin Lustig. An analysis of an available set of linear programming test problems
185 -- 187D. J. White. The largest element first heuristic for the maximization assignment problem

Volume 16, Issue 1

1 -- 11Bryan L. Deuermeyer, Guy L. Curry. On a language for discrete dynamic programming and a microcomputer implementation
13 -- 25Michael D. Oliff, Holly S. Lewis, Robert E. Markland. Aggregate planning in crew-loaded production environments
27 -- 38Israel Spiegler, Yehuda Noff. Dynamic reliability as an alternative to overall data base restoration
39 -- 43Lawrence Bodin, Judy Brown. A model for the allocation of graduate assistant hours: an anecdote on the application of operations research
45 -- 54Lawrence Bodin, George Fagin, Ron Welebny, James Greenberg. The design of a computerized sanitation vehicle routing and scheduling system for the town of oyster bay, new york
55 -- 65Jati K. Sengupta. Nonlinear measures of technical efficiency
67 -- 77Jean Aubin, Jacques A. Ferland. A large scale timetabling problem
79 -- 83Ue-Pyng Wen, Shuh-Tzy Hsu. A note on a linear bilevel programming algorithm based on bicriteria programming