217 | -- | 219 | Gündüz Ulusoy, Selçuk Karabati. Sixth International Workshop on Project Management and Scheduling |
220 | -- | 238 | Salah E. Elmaghraby. On criticality and sensitivity in activity networks |
239 | -- | 251 | Trond Jørgensen, Stein W. Wallace. Improving project cost estimation by taking into account managerial flexibility |
252 | -- | 261 | Tzvi Raz, Erdal Erel. Optimal timing of project control points |
262 | -- | 278 | Gündüz Ulusoy, Serkan Cebelli. An equitable approach to the payment scheduling problem in project management |
279 | -- | 296 | John B. Jensen. The impact of resource flexibility and staffing decisions on cellular and departmental shop performance |
297 | -- | 316 | Christian Artigues, François Roubellat. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes |
317 | -- | 331 | Jacek Blazewicz, Erwin Pesch, Malgorzata Sterna. The disjunctive graph machine representation of the job shop scheduling problem |
332 | -- | 343 | Philippe Torres, Pierre Lopez. On Not-First/Not-Last conditions in disjunctive scheduling |
344 | -- | 354 | Christelle Guéret, Narendra Jussien, Christian Prins. Using intelligent backtracking to improve branch-and-bound methods: An application to Open-Shop problems |
355 | -- | 362 | Peter Brucker, Sigrid Knust. A linear programming and constraint propagation-based lower bound for the RCPSP |
363 | -- | 382 | Jacques Carlier, Emmanuel Néron. A new LP-based lower bound for the cumulative scheduling problem |
383 | -- | 393 | Kristina Soric. A cutting plane algorithm for a single machine scheduling problem |
394 | -- | 407 | Sönke Hartmann, Rainer Kolisch. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem |
408 | -- | 424 | Antonio Luis Lova, Concepción Maroto, María Pilar Tormos. A multicriteria heuristic method to improve resource allocation in multiproject scheduling |
425 | -- | 443 | Klaus Neumann, J. Zimmermann. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints |
444 | -- | 457 | Manuel Laguna, M. Pilar Lino Sorlí, Ángeles Pérez, Sacramento Quintanilla, Vicente Valls. Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines |
458 | -- | 465 | Piotr Jedrzejowicz, Izabela Wierzbowska. Scheduling multiple variant programs under hard real-time constraints |