65 | -- | 79 | Wen-Yau Liang, Peter O Grady. A constrained evolutionary search formalism for remote design with modules |
80 | -- | 94 | Douglas Troy, Yasser Dessouky, George Hellstern, H. Mark, Zhuming Wang. Approaches to work cell programming language design |
95 | -- | 106 | Moutaz Khouja, David E. Booth, Michael Suh, John K. Mahaney Jr. Statistical procedures for task assignment and robot selection in assembly cells |
107 | -- | 120 | V. A. Albuquerque, F. W. Liou, O. R. Mitchell. Inspection point placement and path planning algorithms for automatic CMM inspection |
121 | -- | 138 | H. M. E. Cheung, W. H. R. Yeung, H. C. A. Ng, S. T. R. Fung. HSCF: a holonic shop floor control framework for flexible manufacturing systems |
139 | -- | 147 | Sanchoy K. Das, Jean Benoit Almonor. A concurrent engineering approach for the development of medical devices |
148 | -- | 156 | Fiorenzo Franceschini, Luca Settineri. Control charts for the on-line diagnostics of CMM performances |
157 | -- | 168 | W. H. R. Yeung, P. R. Moore. Genetic algorithms and flexible process planning in the design of fault tolerant cell control for flexible assembly systems |