195 | -- | 196 | Abdelhakim Artiba, Nikolay Tchernev. Editorial |
197 | -- | 209 | Latifa Ouzizi, Didier Anciaux, Marie-Claude Portmann, François Vernadat. A model for cooperative planning within a virtual enterprise |
210 | -- | 219 | Fabrice Dusonchet, Max-Olivier Hongler. Priority index heuristic for multi-armed bandit problems with set-up costs and/or set-up time delays |
220 | -- | 233 | Giovanni Miragliotta, Alberto Portioli-Staudacher. The integrated use of information and stocks in the management of uncertain lumpy demand |
234 | -- | 247 | Mohamed Ghazel, Armand Toguyéni, Michel Bigand. A semi-formal approach to build the functional graph of an automated production system for supervision purposes |
248 | -- | 263 | L. Cuenca, A. Ortiz, F. Vernadat. From UML or DFD models to CIMOSA partial models and enterprise components |
264 | -- | 277 | K. Krishnaiyer, S. Hossein Cheraghi. Ant algorithms: web-based implementation and applications to manufacturing system problems |
278 | -- | 286 | C. Chung, Q. Peng. Evolutionary sequence planning for selective disassembly in de-manufacturing |
287 | -- | 293 | R. A. Cader, A. A. Ball, R. J. Cripps. Pattern shape design for ceramic ware: an integrated solution |
294 | -- | 300 | Dimitris Mavrikios, Vassiliki Karabatsou, Dimitris Fragos, George Chryssolouris. A prototype virtual reality-based demonstrator for immersive and interactive simulation of welding processes |