487 | -- | 503 | S. Shokohyar, S. Mansour. Simulation-based optimisation of a sustainable recovery network for Waste from Electrical and Electronic Equipment (WEEE) |
504 | -- | 512 | Guanlong Deng, Kang Zhang, Xingsheng Gu. A hybrid discrete differential evolution algorithm to minimise total tardiness on identical parallel machines |
513 | -- | 526 | Tsung-Nan Tsai. An adaptive diagnosis system for copper wire bonding process control and quality assessment in integrated circuit assembly |
527 | -- | 539 | Kwabena Agyapong-Kodua, Rob Darlington, Svetan M. Ratchev. Towards the derivation of an integrated design and manufacturing methodology |
540 | -- | 560 | Atiya Al-Zuheri, Lee Luong, Ke Xing. Prediction and analysis impact of operational design of a manual assembly system with walking workers on performance |
561 | -- | 570 | S. Sivakumar, V. Dhanalakshmi. An approach towards the integration of CAD/CAM/CAI through STEP file using feature extraction for cylindrical parts |
571 | -- | 582 | J. J. Liu, Z. A. Lin, Q. X. Chen, N. Mao, X. D. Chen. A decision support to assign mould due date at customer enquiry stage in computer-integrated manufacturing (CIM) environments |