333 | -- | 354 | Tammy Drezner, Zvi Drezner, Pawel Jan Kalczynski. Gradual cover competitive facility location |
355 | -- | 395 | Taher Ahmadi, Zümbül Atan, Ton de Kok, Ivo Adan. Time-based service constraints for inventory systems with commitment lead time |
397 | -- | 426 | Simon Emde, Hamid Abedinnia, Anne Lange, Christoph H. Glock. Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space |
427 | -- | 460 | Kai Watermeyer, Jürgen Zimmermann 0001. A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints |
461 | -- | 497 | Giorgi Tadumadze, Simon Emde, Heiko Diefenbach. Exact and heuristic algorithms for scheduling jobs with time windows on unrelated parallel machines |
499 | -- | 528 | Manuele Leonelli, Eva Riccomagno, Jim Q. Smith. Coherent combination of probabilistic outputs for group decision making: an algebraic approach |
529 | -- | 565 | Menghan Chen, Sheng Ang, Lijing Jiang, Feng Yang 0005. Centralized resource allocation based on cross-evaluation considering organizational objective and individual preferences |
567 | -- | 584 | Mohammad Ali Saniee Monfared, Sayyed Ehsan Monabbati, Mahsa Mahdipour Azar. Bi-objective optimization problems with two decision makers: refining Pareto-optimal front for equilibrium solution |