Journal: Rel. Eng. & Sys. Safety

Volume 88, Issue 3

195 -- 205Steve Epstein, Antoine Rauzy. Can we trust PRA?
207 -- 214Andre Kleyner, Peter Sandborn. A warranty forecasting model based on piecewise statistical distributions and stochastic simulation
215 -- 228Younju Oh, Junbeom Yoo, Sung Deok Cha, Han Seong Son. Software safety analysis of function block diagrams using fault trees
229 -- 245Jan Bredereke, Axel Lankenau. Safety-relevant mode confusions - modelling and reducing them
247 -- 272Adrian V. Gheorghe, Jürg Birchmeier, Dan V. Vamanu, Ioannis A. Papazoglou, Wolfgang Kröger. Comprehensive risk assessment for rail transportation of dangerous goods: a validated platform for decision support
273 -- 289Adolfo Crespo Marquez, Antonio Sánchez Heguedas, Benoît Iung. Monte Carlo-based assessment of system availability. A case study for cogeneration plants
291 -- 300Hyunki Kim, Hyeuntae Lee, Keyseo Lee. The design and analysis of AVTMR (all voting triple modular redundancy) and dual-duplex system
301 -- 309Zhibin Tan. Estimation of component failure probability from masked binomial system testing data
311 -- 0Zhibin Tan. Corrigendum to "Minimal cut sets of s-t network with k-out-of-n nodes" [Reliability Engineering and System Safety 82 (2003) 49-54]

Volume 88, Issue 2

125 -- 0Aarnout Brombacher. Reliability in strongly innovative products; a threat or a challenge?
127 -- 135Simon Minderhoud, Peter Fraser. Shifting paradigms of product development in fast and dynamic markets
137 -- 146Aarnout Brombacher, Peter C. Sander, Peter J. M. Sonnemans, Jan L. Rouvroye. Managing product reliability in business processes 'under pressure'
147 -- 155Valia T. Petkova, Lu Yuan, Roxana A. Ion, Peter C. Sander. Designing reliability information flows
157 -- 169Bharatendra Rai, Nanua Singh. A modeling framework for assessing the impact of new time/mileage warranty limits on the number and cost of automotive warranty claims
171 -- 180Rakesh Menon, Han Tong Loh, S. Sathiya Keerthi. Analyzing textual databases using data mining to enable fast product development processes
181 -- 189H. Ward, A. H. Christer. Modelling the re-design decision for a warranted product

Volume 88, Issue 1

1 -- 32Robert P. Rechard, Martin S. Tierney. Assignment of probability distributions for parameters in the 1996 performance assessment for the Waste Isolation Pilot Plant. Part 1: description of process
33 -- 80Robert P. Rechard, Martin S. Tierney. Assignment of probability distributions for parameters in the 1996 performance assessment for the Waste Isolation Pilot Plant. Part 2. Application of process
81 -- 91Frank P. A. Coolen, Pauline Coolen-Schrijner, Maha Rahrouh. Bayesian reliability demonstration for failure-free periods
93 -- 98Jing-An Li, Yue Wu, Kin Keung Lai, Ke Liu. Reliability estimation and prediction of multi-state components and coherent systems
99 -- 107Rómulo I. Zequeira, Christophe Bérenguer. On the inspection policy of a two-component parallel system with failure interaction
109 -- 119Blaise Conrard, Jean-Marc Thiriet, Michel Robert. Distributed system design based on dependability evaluation: a case study on a pilot thermal process