| 435 | -- | 447 | Fabio Furini, Martin Philip Kidd, Carlo Alfredo Persiani, Paolo Toth. Improved rolling horizon approaches to the aircraft sequencing problem |
| 449 | -- | 469 | René van Bevern, Matthias Mnich, Rolf Niedermeier, Mathias Weller. Interval scheduling and colorful independent sets |
| 471 | -- | 486 | Maliheh Aramon Bajestani, J. Christopher Beck. A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines |
| 487 | -- | 495 | Iwo Bladek, Maciej Drozdowski, Frédéric Guinand, Xavier Schepler. On contiguous and non-contiguous parallel task scheduling |
| 497 | -- | 511 | Behzad Hezarkhani, Wieslaw Kubiak. Decentralized subcontractor scheduling with divisible jobs |
| 513 | -- | 524 | Yossef Luzon, Yariv Marmor, Eugene Khmelnitsky. Optimal control of a two-server flow-shop network |
| 525 | -- | 543 | Davide Giglio. Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times |