Journal: J. Scheduling

Volume 21, Issue 4

387 -- 411Bailin Wang, Kai Huang 0003, Tieke Li. Two-stage hybrid flowshop scheduling with simultaneous processing machines
413 -- 428Helga Ingimundardottir, Thomas Philip Runarsson. Discovering dispatching rules from data using imitation learning: A case study for the job-shop problem
429 -- 441Joan Boyar, Leah Epstein, Lene M. Favrholdt, Kim S. Larsen, Asaf Levin. Online-bounded analysis
443 -- 460Liang-Liang Fu, Mohamed Ali Aloulou, Christian Artigues. Integrated production and outbound distribution scheduling problems with job release dates and deadlines
461 -- 482Zhijun Xu, Dehua Xu. Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time