Journal: J. Scheduling

Volume 21, Issue 6

579 -- 580Nicholas G. Hall, Yumei Huo, Benjamin Li, Michael Pinedo, Hairong Zhao. In memoriam: Dr. Joseph Leung
581 -- 582Jacek Blazewicz, Benjamin Moseley, Erwin Pesch, Denis Trystram, Guochuan Zhang. New challenges in scheduling theory
583 -- 593Dariusz Dereniowski, Wieslaw Kubiak. Shared processor scheduling
595 -- 606Dominik Kress, Maksim Barketau, Erwin Pesch. Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
607 -- 617Marjan van den Akker, Han Hoogeveen, Judith Stoef. Combining two-stage stochastic programming and recoverable robustness to minimize the number of late jobs in the case of uncertain processing times
619 -- 631Kai Wang 0018, Vincent Chau, Minming Li. Scheduling fully parallel jobs
633 -- 646Weiwei Wu, Minming Li, Kai Wang 0018, He Huang, Enhong Chen. Speed scaling problems with memory/cache consideration
647 -- 654Deshi Ye, Danny Z. Chen, Guochuan Zhang. Online scheduling of moldable parallel tasks

Volume 21, Issue 5

483 -- 492Manzhan Gu, Jinwei Gu, Xiwen Lu. An algorithm for multi-agent scheduling to minimize the makespan on m parallel machines
493 -- 503Dusan Knop, Martin Koutecký. Scheduling meets n-fold integer programming
505 -- 516Akiyoshi Shioura, Natalia V. Shakhlevich, Vitaly A. Strusevich, Bernhard Primas. Models and algorithms for energy-efficient scheduling with immediate start of jobs
517 -- 531Douglas S. Altner, Anthony C. Rojas, Leslie D. Servi. A two-stage stochastic program for multi-shift, multi-analyst, workforce optimization with multiple on-call options
533 -- 543Patrick Eugster, Alexander Kesselman, Kirill Kogan, Sergey I. Nikolenko, Alexander Sirotkin. Admission control in shared memory switches
545 -- 563Pan Zou, Manik Rajora, Steven Y. Liang. A new algorithm based on evolutionary computation for hierarchically coupled constraint optimization: methodology and application to assembly job-shop scheduling
565 -- 578Wenchang Luo, Taibo Luo, Randy Goebel, Guohui Lin. Rescheduling due to machine disruption to minimize the total weighted completion time

Volume 21, Issue 4

387 -- 411Bailin Wang, Kai Huang 0003, Tieke Li. Two-stage hybrid flowshop scheduling with simultaneous processing machines
413 -- 428Helga Ingimundardottir, Thomas Philip Runarsson. Discovering dispatching rules from data using imitation learning: A case study for the job-shop problem
429 -- 441Joan Boyar, Leah Epstein, Lene M. Favrholdt, Kim S. Larsen, Asaf Levin. Online-bounded analysis
443 -- 460Liang-Liang Fu, Mohamed Ali Aloulou, Christian Artigues. Integrated production and outbound distribution scheduling problems with job release dates and deadlines
461 -- 482Zhijun Xu, Dehua Xu. Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time

Volume 21, Issue 3

269 -- 284Leah Epstein. A survey on makespan minimization in semi-online environments
285 -- 304Sana Dahmen, Monia Rekik, François Soumis. An implicit model for multi-activity shift scheduling problems
305 -- 312Christoph Dürr, Zdenek Hanzálek, Christian Konrad, Yasmina Seddik, René Sitters, Oscar C. Vásquez, Gerhard J. Woeginger. The triangle scheduling problem
313 -- 325Venkatesan T. Chakaravarthy, Anamitra R. Choudhury, Shalmoli Gupta, Sambuddha Roy, Yogish Sabharwal. Improved algorithms for resource allocation under varying capacity
327 -- 336Hadas Shachnai, Ariella Voloshin, Shmuel Zaks. Flexible bandwidth assignment with application to optical networks
337 -- 348Jianming Dong, Xueshi Wang, Jueliang Hu, Guohui Lin. Single machine scheduling with job delivery to multiple customers
349 -- 365Salim Rostami, Stefan Creemers, Roel Leus. New strategies for stochastic resource-constrained project scheduling
367 -- 386Lunce Fu, Maged Dessouky. Algorithms for a special class of state-dependent shortest path problems with an application to the train routing problem

Volume 21, Issue 2

129 -- 130Zdenek Hanzálek, Graham Kendall, Barry McCollum, Premysl Sucha, Greet Vanden Berghe. Preface
131 -- 142Adrian Zimmermann, Norbert Trautmann. A list-scheduling heuristic for the short-term planning of assessment centers
143 -- 165Jonas Ingels, Broos Maenhout. The impact of overtime as a time-based proactive scheduling and reactive allocation strategy on the robustness of a personnel shift roster
167 -- 189Tom Rihm, Philipp Baumann. Staff assignment with lexicographically ordered acceptance levels
191 -- 207Julia Lange, Frank Werner 0001. Approaches to modeling train scheduling problems as job-shop problems with blocking constraints
209 -- 226Yi Tan, Lars Mönch, John W. Fowler. A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
227 -- 233Lei Shang, Christophe Lenté, Mathieu Liedloff, Vincent T'Kindt. Exact exponential algorithms for 3-machine flowshop scheduling problems
235 -- 249Liji Shen, Jatinder N. D. Gupta. Family scheduling with batch availability in flow shops to minimize makespan
251 -- 267Tony T. Tran, Meghana Padmanabhan, Peter Yun Zhang, Heyse Li, Douglas G. Down, J. Christopher Beck. Multi-stage resource-aware scheduling for data centers with heterogeneous servers

Volume 21, Issue 1

1 -- 0Edmund K. Burke, Michael Pinedo. Journal of Scheduling (2018)
3 -- 16Damien Prot, Odile Bellenguez-Morineau. A survey on how the structure of precedence constraints may change the complexity class of scheduling problems
17 -- 33Gréanne Leeftink, Erwin W. Hans. Case mix classification and a benchmark set for surgery scheduling
35 -- 51Evripidis Bampis, Alexander V. Kononov, Dimitrios Letsios, Giorgio Lucarelli, Maxim Sviridenko. Energy-efficient scheduling and routing via randomized rounding
53 -- 76Aurélien Froger, Michel Gendreau, Jorge E. Mendoza, Eric Pinson, Louis-Martin Rousseau. Solving a wind turbine maintenance scheduling problem
77 -- 92Ernst Althaus, André Brinkmann, Peter Kling, Friedhelm Meyer auf der Heide, Lars Nagel 0001, Sören Riechers, Jirí Sgall, Tim Süß. Scheduling shared continuous resources on many-cores
93 -- 109Emilio Zamorano, Annika Becker, Raik Stolletz. Task assignment with start time-dependent processing times for personnel at check-in counters
111 -- 126Nils Boysen, Dirk Briskorn, Simon Emde. Scheduling electric vehicles and locating charging stations on a path
127 -- 128Jelke J. van Hoorn. The Current state of bounds on benchmark instances of the job-shop scheduling problem