Journal: J. Scheduling

Volume 21, Issue 2

129 -- 130Zdenek Hanzálek, Graham Kendall, Barry McCollum, Premysl Sucha, Greet Vanden Berghe. Preface
131 -- 142Adrian Zimmermann, Norbert Trautmann. A list-scheduling heuristic for the short-term planning of assessment centers
143 -- 165Jonas Ingels, Broos Maenhout. The impact of overtime as a time-based proactive scheduling and reactive allocation strategy on the robustness of a personnel shift roster
167 -- 189Tom Rihm, Philipp Baumann. Staff assignment with lexicographically ordered acceptance levels
191 -- 207Julia Lange, Frank Werner 0001. Approaches to modeling train scheduling problems as job-shop problems with blocking constraints
209 -- 226Yi Tan, Lars Mönch, John W. Fowler. A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines
227 -- 233Lei Shang, Christophe Lenté, Mathieu Liedloff, Vincent T'Kindt. Exact exponential algorithms for 3-machine flowshop scheduling problems
235 -- 249Liji Shen, Jatinder N. D. Gupta. Family scheduling with batch availability in flow shops to minimize makespan
251 -- 267Tony T. Tran, Meghana Padmanabhan, Peter Yun Zhang, Heyse Li, Douglas G. Down, J. Christopher Beck. Multi-stage resource-aware scheduling for data centers with heterogeneous servers