Journal: J. Scheduling

Volume 16, Issue 6

549 -- 550Ender Özcan, Christian Artigues, Eric Bourreau, H. Murat Afsar. Special issue on maintenance scheduling: theory and applications
551 -- 566Vincent Jost, David Savourey. A 0-1 integer linear programming approach to schedule outages of nuclear power plants
567 -- 583Steffen Godskesen, Thomas Sejr Jensen, Niels Kjeldsen, Rune Larsen. Solving a real-life, large-scale energy management problem
585 -- 604Antoine Rozenknop, Roberto Wolfler Calvo, Laurent Alfandari, Daniel Chemla, Lucas Létocart. Solving the electricity production planning problem by a column generation based heuristic
605 -- 628Richard Lusby, Laurent Flindt Muller, Bjørn Petersen. A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
629 -- 648Felix Brandt, Reinhard Bauer, Markus Völker, Andreas Cardeneo. A constraint programming-based approach to a large-scale energy management problem with varied constraints - A solution approach to the ROADEF/EURO Challenge 2010
649 -- 659Natashia Boland, Thomas Kalinowski, Hamish Waterer, Lanbo Zheng. Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain
661 -- 673Joaquín A. Pacheco, Francisco Ángel-Bello, Ada M. Alvarez. A multi-start tabu search method for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times
675 -- 683Hans Kellerer, Kabir Rustogi, Vitaly A. Strusevich. Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance

Volume 16, Issue 5

443 -- 460Mahsa Elahipanah, Guy Desaulniers, Ève Lacasse-Guay. A two-phase mathematical-programming heuristic for flexible assignment of activities and tasks to work shifts
461 -- 477Kangbok Lee, Kyungkuk Lim. Semi-online scheduling problems on a small number of machines
479 -- 494Stefan Bock, Kathrin Klamroth. Minimizing sequence-dependent setup costs in feeding batch processes under due date restrictions
495 -- 518Roland Braune, Günther Zäpfel, Michael Affenzeller. Enhancing local search algorithms for job shops with min-sum objectives by approximate move evaluation
519 -- 527Gur Mosheiov, Dvir Shabtay. Maximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing times
529 -- 538Evripidis Bampis, Dimitrios Letsios, Giorgio Lucarelli, Evangelos Markakis, Ioannis Milis. On multiprocessor temperature-aware scheduling problems
539 -- 547Lukasz Jez, Jarett Schwartz, Jiri Sgall, József Békési. Lower bounds for online makespan minimization on a small number of related machines

Volume 16, Issue 4

347 -- 348Michael Bender, Jacek Blazewicz, Erwin Pesch, Denis Trystram, Guochuan Zhang. Guest editorial: "New trends in scheduling" - Centre CNRS "La Villa Clythia" Frejus Workshop, September 12-17, 2010
349 -- 368Krzysztof Kurowski, Ariel Oleksiak, Wojciech Piatek, Jan Weglarz. Hierarchical scheduling strategies for parallel tasks and advance reservations in grids
369 -- 383Christian Grimme, Joachim Lepping, Uwe Schwiegelshohn. Multi-criteria scheduling: an agent-based approach for expert knowledge integration
385 -- 394Antonios Antoniadis, Chien-Chung Huang. Non-preemptive speed scaling
395 -- 403Nodari Vakhania. A study of single-machine scheduling problem to maximize throughput
405 -- 415Baris Çiftçi, Peter Borm, Herbert Hamers, Marco Slikker. Batch sequencing and cooperation
417 -- 422S. S. Li, Peter Brucker, Chi T. Ng, T. C. Edwin Cheng, Natalia V. Shakhlevich, J. J. Yuan. A note on reverse scheduling with maximum lateness objective
423 -- 428Dimitrios G. Pandelis. A note on preemptive scheduling of multiclass jobs with geometric service times and hard deadlines
429 -- 435Amir Elalouf, Eugene Levner, Huajun Tang. An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem
437 -- 438Damien Prot, Odile Bellenguez-Morineau, C. Lahlou. A note on the paper "Minimizing total tardiness on parallel machines with preemptions" by Kravchenko and Werner (2012)
439 -- 441Svetlana A. Kravchenko, Frank Werner. Erratum to: Minimizing total tardiness on parallel machines with preemptions

Volume 16, Issue 3

253 -- 260Qiulan Zhao, Jinjiang Yuan. Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption
261 -- 271B. Q. Fan, T. C. Edwin Cheng, S. S. Li, Q. Feng. Bounded parallel-batching scheduling with two competing agents
273 -- 289Andreas Schutt, Thibaut Feydy, Peter J. Stuckey, Mark G. Wallace. Solving RCPSP/max by lazy clause generation
291 -- 311Mustafa Misir, Katja Verbeeck, Patrick De Causmaecker, Greet Vanden Berghe. A new hyper-heuristic as a general problem solver: an implementation in HyFlex
313 -- 329Yasmina Seddik, Christophe Gonzales, Safia Kedad-Sidhoum. Single machine scheduling with delivery dates and cumulative payoffs
331 -- 336Yebin Zhang, Xianyi Wu, Xian Zhou. Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns
337 -- 346Márton Drótos, Tamás Kis. Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times

Volume 16, Issue 2

151 -- 160Erik D. Demaine, Mohammad Ghodsi, MohammadTaghi Hajiaghayi, Amin S. Sayedi-Roshkhar, Morteza Zadimoghaddam. Scheduling to minimize gaps and power consumption
161 -- 183Kerem Bülbül, Philip Kaminsky. A linear programming-based method for job shop scheduling
185 -- 198Nils Boysen, Stefan Bock, Malte Fliedner. Scheduling of inventory releasing jobs to satisfy time-varying demand: an analysis of complexity
199 -- 213Gábor Nagy, Niaz A. Wassan, Saïd Salhi. The vehicle routing problem with restricted mixing of deliveries and pickups
215 -- 229Joachim Schauer, Cornelius Schwarz. Job-shop scheduling in a body shop
231 -- 242Marta Rocha, José Fernando Oliveira, Maria Antónia Carravilla. Cyclic staff scheduling: optimization models for some real-life problems
243 -- 252Alberto García-Villoria, Albert Corominas, Xavier Delorme, Alexandre Dolgui, Wieslaw Kubiak, Rafael Pastor. A branch and bound algorithm for the response time variability problem

Volume 16, Issue 1

1 -- 2Edmund K. Burke, Michael Pinedo. Journal of Scheduling (2013)
3 -- 28Dvir Shabtay, Nufar Gaspar, Moshe Kaspi. A survey on offline scheduling with rejection
29 -- 45Paolo Brandimarte. Scheduling satellite launch missions: an MILP approach
47 -- 58Peter Sanders, Johannes Singler, Rob van Stee. Real-time integrated prefetching and caching
59 -- 68R. Simpson, A. Abakarov. Mixed-integer linear programming models for batch sterilization of packaged-foods plants
69 -- 79Esaignani Selvarajah, George Steiner, Rui Zhang. Single machine batch scheduling with release times and delivery costs
81 -- 91Alexander Fanghänel, Sascha Geulen, Martin Hoefer, Berthold Vöcking. Online capacity maximization in wireless networks
93 -- 103Thierry Garaix, Christian Artigues, Cyril Briand. Fast minimum float computation in activity networks under interval uncertainty
105 -- 115Dirk Briskorn, Florian Jaehn, Erwin Pesch. Exact algorithms for inventory constrained scheduling on a single machine
117 -- 127Niv Buchbinder, Joseph Naor. Fair online load balancing
129 -- 149Jens O. Brunner, Jonathan F. Bard. Flexible weekly tour scheduling for postal service workers using a branch and price