Time Optimization of Warehouse Operations Through Industry 4.0 Technology Implementation: Case Study from a Spare Parts Warehouse in the Oil and Gas Industry

Natalia Khan, Halldor Arnarson, Wei Deng Solvang, Hao Yu 0003. Time Optimization of Warehouse Operations Through Industry 4.0 Technology Implementation: Case Study from a Spare Parts Warehouse in the Oil and Gas Industry. In IEEE/SICE International Symposium on System Integration, SII 2024, Ha Long, Vietnam, January 8-11, 2024. pages 1018-1023, IEEE, 2024. [doi]

Abstract

Abstract is missing.