Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization

Javad Navaei, Ashkan Mozdgir, Hooman Hidaji. Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization. In Hamid R. Arabnia, David de la Fuente, Elena B. Kozerenko, José Angel Olivas, Rui Chang, Peter M. LaMonica, Raymond A. Liuzzi, Ashu M. G. Solo, editors, Proceedings of the 2010 International Conference on Artificial Intelligence, ICAI 2010, July 12-15, 2010, Las Vegas Nevada, USA, 2 Volumes. pages 704-709, CSREA Press, 2010.

Authors

Javad Navaei

This author has not been identified. Look up 'Javad Navaei' in Google

Ashkan Mozdgir

This author has not been identified. Look up 'Ashkan Mozdgir' in Google

Hooman Hidaji

This author has not been identified. Look up 'Hooman Hidaji' in Google