Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization

Javad Navaei, Ashkan Mozdgir, Hooman Hidaji. Two-stage Assembly Flowshop Scheduling Problem With Bi-objective of Number of Tardy and Makespan Minimization. In Hamid R. Arabnia, David de la Fuente, Elena B. Kozerenko, José Angel Olivas, Rui Chang, Peter M. LaMonica, Raymond A. Liuzzi, Ashu M. G. Solo, editors, Proceedings of the 2010 International Conference on Artificial Intelligence, ICAI 2010, July 12-15, 2010, Las Vegas Nevada, USA, 2 Volumes. pages 704-709, CSREA Press, 2010.

Abstract

Abstract is missing.